欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 女人与狥交下配a级正在播放| 国语一级片| 大陆年轻帅小伙飞机gay| 久久精品综合| 卡一卡2卡3高清乱码网| 小泽玛利亚番号| 国产人妖ts在线观看网站| 日本理论午夜中文字幕| 女人被男人躁到呻吟的| 特级毛片全部免费播放a一级| 久久久久久久久国产| 福利一区二区在线| 亚洲国产综合专区在线电影| 八戒在线视频| 99久久精品国产免费| 精品精品国产高清a级毛片 | 鸥美一级黄色片| 一卡二卡三卡四卡在线| 91麻豆国产福利精品| av成人在线电影| 免费毛片a线观看| 国产捆绑调教| 中文字幕精品视频在线| 久久久久久久综合狠狠综合| 性高湖久久久久久久久| 亚洲春黄在线观看| 午夜私人影院在线观看| 国产精品久久久精品三级| 九九久久精品国产免费看小说| 啊灬啊灬啊灬快灬深用口述| 国产福利在线观看一区二区| 欧美激情一区二区三区| 再深点灬舒服灬太大了添学长| 美国一级毛片免费看| 伊人久久中文大香线蕉综合| 中文字幕在线观看国产| 中文字幕电影在线观看| 国产精自产拍久久久久久蜜| 免费观看欧美一级牲片一| 国产香蕉久久| 美女扒了内裤让男人桶爽视频|