欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 毛片1| 国产精品一区二区久久沈樵| 性高清hd| 男和女一起怼怼怼30分钟| 日本不卡一区二区三区四区| 999国产精品999久久久久久| 成年人在线免费观看| 免费中日高清无专码有限公司| 快一点使劲c我在线观看| 在线播放国产一区二区三区| 97色伦图片97综合影院| 妖精播放视频| 成人免费看www网址入口| 里番本子侵犯肉全彩| 国产精品无码永久免费888| 欧美xxxx三人交性视频| 三上悠亚ssni409在线看| 国产精品久久久久9999 | 91精品国产免费| 欧美成人怡红院在线观看| 波多野结衣一区| 星空无限传媒好闺蜜2| 啊灬啊别停灬用力啊岳| 日本高清免费不卡在线播放| 中文字幕亚洲一区二区va在线| 男人j进入女人p狂躁免费观看| 1313苦瓜网在线播| 久久精品精品| 免费很黄很色裸乳在线观看| 深夜动态福利gif动态进| 手机av在线播放| 日本一本高清视频| 色老太bbw| 欧美美女一区| 太深太粗太爽太猛了视频| 青青热久免费精品视频精品| 免费性电影| 一级美国乱色毛片| 女生张开腿让男生通| 美国式禁忌在完整有限中字| 岳女一起爽|