欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 男人把女人桶爽30分钟一| 国产色a在线观看| 国产又粗又猛又大的视频| 亚洲国产成人久久综合一区| 在线中文字幕第一页| 亚洲高清视频免费| 免费精品视频在线| 免费看欧美一级特黄α大片| 伊人精品久久久大香线蕉99| 国产美女无遮挡免费视频| 日本三级中文字版电影| 国产精品一区二区久久精品涩爱 | 调教视频h| 成人毛片18女人毛片免费| 在线观看高嫁肉柳1一4集中文| 一本大道香蕉中文在线高清| 波多野结衣教师系列5| 里番本子侵犯肉全彩| 欧美日韩免费在线视频| 三上悠亚伦理| 国产精品igao视频| 国产一区二区在线观看app| 动漫肉h| 免费看毛片网| 动漫h肉yin文| 草逼影视| 精品无码久久久久久国产| 干狠狠| 波多野结衣1048系列电影| 免费国产va在线观看视频| 在线观看视频国产| 2018中文字幕第一页| 特级毛片www| 久久青青草原精品影院| 国产午夜精品一区二区三区| 国产91电影| 亚洲欧美精品日韩欧美| 老师粗又长好猛好爽视频| 国产伦理一区二区三区| 葫芦里不卖药葫芦娃app| 波多野结衣中文字幕一区|